综合无码精品国产_国产日韩精品视频_免费播放片AV高清在线观看_国产91在线精品蜜月_小宝第二场高颜值返场_91小仙女思长腿妍薄纱女神_国产精品成人午夜影院_唔嗯啊欧美一级作爱网站_免费A级毛片免费完整_日本韩国在线三级

新聞中心
Your current location : Home >> News >> Industry News

ContactContact Us

Changzhou Guofeng Machinery Co., Ltd

Telephone:0519-88361968

Facsimile:0519-88351735

Mail box:guofengjixie888@163.com

website:pengchou.cn/en

Address: Beizheng Village Industrial Park, Qishuyan, Changzhou City, Jiangsu Province

The knowledge points of the second construction: the erection method of the simply supported T-shaped beam

2020-12-10 09:49:31
second

① Assembling the bridge erecting machine: use military beams or Bailey beams to assemble the bridge erecting machine.



②Assembling beam: Use a gantry crane to lift the T-shaped beam onto the beam transport flat car.



③Girder transport: the rail car hauls the girder transport flat car, and a temporary track is set under the car, and the standard gauge is adopted. The speed of the beam-transporting heavy vehicle is controlled at 5.0km/h, and the empty vehicle is 10.0km/h. The beam is transported at the top position, and the rail car is placed behind the beam-transporting vehicle.



④Girder feeding: the cranes on the two cranes on the bridge erecting machine lift the beams to be erected and move forward along the tracks on the left and right guide beams to the beam erection position. The lifting speed and the moving beam speed are controlled at 1.0m/min.



⑤Beam drop: The cranes on the two overhead cranes on the bridge erecting machine will slowly drop the beams to be erected and move them horizontally into position respectively. The tops of the front and rear piers are provided with horizontal moving rails. After the T-shaped beams are moved horizontally in place, jacks are used to lift the beams, and the horizontal moving rails are removed. Then the T-shaped beams are aligned with the beam line to slowly drop the beams into place, and the support bolts are completely dropped. Preserve holes and connect the left and right T-shaped beams horizontally, then pour the support and anchor the mortar, and install the bridge support under the T-shaped beam in advance in the beam storage yard.



⑥The bridge erecting machine passes through the hole;



⑦ Bridge erecting machine dismantling: After all the beams are erected, the bridge erecting machine is removed. The lower roadbed section is removed by crane, or the bridge erecting machine is returned to the assembly position, and the dismantling is completed according to the reverse process of assembly.

label

Website of this article:http://pengchou.cn/en/news/459.html

Changzhou Guofeng Machinery Co., Ltd

Address: Beizheng Village Industrial Park, Qishuyan, Changzhou City, Jiangsu Province

Sales Department Tel: 0519-88361968

Administrative Personnel Department Tel: 0519-88362692

Fax: 0519-88351735 Email: guofengjixie88@163.com

Website: pengchou.cn



123.png